Mechanical Biological Waste Treatment Plant, Maringá (Brazil) Implementation: 2008-2009 Demonstration Project: (2008) changed into an operating treatment plant (since end of the year 2008): Aeration of fresh, mechanically pre-treated waste (daily 300 Mg) for compost production. >>> Video
 ARGE Sanierung Rechte Kremszeile (Austria) Implementation: 2008 Aeration in terms of odour stabilisation of approx. 35.000 m³ soil contaminated with waste in a former Donau creek at Krems prior to removal and treatment of the contaminated material.
 MEAB Schöneiche intermediate landfill (Germany) Implementation: 2007 Pre-aeration of an intermediate waste depot using the BIOPUSTER process prior to controlled re-usage (100,000 m²).
 Research Institute for Global Environmental Systems Ltd., Osaka (Japan) Implementation: 2006-2007 Demonstration project: Treatment of organic waste in combination with ash from incinerated household waste using the BIOPUSTER process.
 Bilfinger Berger Ambiente, Fiorenzuola (Italy) Implementation: 2005-2006 In-situ stabilisation of an 80,000 m² landfill using the BIOPUSTER process in the municipality of Fiorenzuola.
 ARGE Clearance of Fischer landfill, Theresienfeld (Austria) Implementation: 2004 Containment and removal of organic contaminants (CFCs, BTEX) from around 30,000 m² of mineral waste; extracted over two planes.
 Research Institute for Global Environmental Systems Ltd., Miura-Shi (Japan) Implementation: 2004 Demonstration project: Overhaul of a Japanese landfill using the BIOPUSTER process in the Kanagawa-ken District.
 Burgenland Waste Disposal Association site, Unterfrauenhaid (Austria) Implementation: 2003 Overhaul / replacement of seep water drainage at a landfill while still in use by pre-treating the material to be excavated using the BIOPUSTER process.
 Wiener Neudorf Council (Austria) Implementation: 2002-2003 Odour stabilisation of Wiener Neudorf landfill (approx. 750,000 t) using the BIOPUSTER process prior to removing waste material.
 Republic of Austria, Theresienfeld (Austria) Implementation: 2002-2003 Odour stabilisation of Fischer landfill (approx. 850,000 t) using the BIOPUSTER process prior to removing waste material.
 Seibersdorf Research Centre (Austria) Implementation: 2002 Research project: Treatment of soil contaminated with PAH using BIOPUSTER process to inject ozone. Lysimeter tests.
 City of Vienna Council, MA 48 (Austria) Implementation: 2001 Pilot project: Using the BIOPUSTER process prior to sorting residual waste material at Rautenweg dump with the objective of reducing volume.
 ALSAD Langes Feld GmbH, Vienna (Austria) Implementation: 1999-2000 Large-scale test: Treatment of residual waste fraction using the BIOPUSTER process as a preliminary stage prior to refinement.
 Seibersdorf Research Centre (Austria) Implementation: 1999-2000 Pilot project: Using BIOPUSTER process to overhaul landfill.
 ASA Oberösterreich Holding GmbH, Aichkirchen (Austria) Implementation: 1999-2000 Overhaul of Kiener landfill. Pre-treatment using the BIOPUSTER process to stabilise odour (40,000 m² household and hazardous waste) prior to relocation.
 ECOFOR, Pontedera / Pisa (Italy) Implementation: 1999 Odour stabilisation of approx. 9,000 m² of waste material using the BIOPUSTER process prior to relocation.
 Merckens, Schwertberg (Germany) Implementation: 1999 Pre-treatment using the BIOPUSTER process to stabilise odour (20,000 m²) prior to relocation.
 Feldbach Council (Austria) Implementation: 1998-1999 Biological in-situ overhaul of a 15,000 m² household waste site, partially covered by new buildings, using the BIOPUSTER process (duration of project: 16 months).
 Saehan (Korea) Implementation: 1998 Sold a BIOPUSTER test system (laboratory lysimeter system) and training for personnel.
 Bilfinger+Berger Bau-AG (Munich), Nördlingen (Germany) Implementation: 1997-1998 Complete overhaul of the household waste dump in Nördlingen following treatment using the BIOPUSTER process: replacement of damaged seep water pipes, line-by-line, relocation of 150,000 m² of material after treatment, covering and re-cultivating disused landfill site.
 Landkreis Stendal (Germany) Implementation: 1997 Large-scale test of mechanical-biological waste treatment using the BIOPUSTER process with four different residual waste fractions at Stendal landfill, duration of project: 8 months.
 Bilfinger+Berger Bau-AG (Munich), Farchant (Germany) Implementation: 1997 Pre-treatment using the BIOPUSTER process to stabilise odour (20,000 m²) prior to relocation during the construction of a new bypass road around Garmisch-Partenkirchen.
 Republic of Austria, Weikersdorf (Austria) Implementation: 1996-1998 Odour stabilisation of Helene Berger landfill (900,000 t) using the BIOPUSTER process prior to removing waste material.
 Oliebranchens Miljopulje (Denmark) Implementation: 1995-1998 In-situ overhaul of a former petrol station site using the BIOPUSTER process.
 Lower Austria Environmental Protection Agency, Horn (Austria) Implementation: 1994-1996 Overhaul of the Horn landfill (300,000 m²) using the BIOPUSTER process prior to relocating waste material.
 Lower Austria Environmental Protection Agency, Gmünd (Austria) Implementation: 1994-1996 Overhaul of the Gmünd landfill (150,000 m²) using the BIOPUSTER process prior to relocating waste material.
 Austrian Railways, St. Anton (Austria) Implementation: 1994 BIOPUSTER treatment of the St. Anton landfill during the expansion of the Arlberg railway to two-track.
 Compost plant, City of Bad Kreuznach (Germany) Implementation: 1994 BIOPUSTER treatment to accelerate the decomposition process at the City of Bad-Kreuznach compost plant.
 Abfallzweck-Verband, Freiburg (Germany) Implementation: 1994 Application of BIOPUSTER process to treat household and residual waste material
 Bilfinger+Berger Bau-AG, Dresden (Germany) Implementation: 1993-1994 Micro-biological in-situ overhaul of a former petrol station site using the BIOPUSTER process.
 City of Vienna Council, MA 48 (Austria) Implementation: 1993 BIOPUSTER treatment to accelerate the decomposition process at the Vienna Council compost plant.
 City of Vienna Council, MA 45 (Austria) Implementation: 1990-1991 Overhaul of the EXPO trade fair ground in Vienna: clearing and relocating a landfill with 600,000 m² of household waste and building rubble, first time BIOPUSTER process is used for odour stabilisation.

|
|
 |