References

Mechanical Biological Waste Treatment Plant, Maringá (Brazil)
Implementation: 2008-2009
Demonstration Project: (2008) changed into an operating treatment plant (since end of the year 2008): Aeration of fresh, mechanically pre-treated waste (daily 300 Mg) for compost production. >>> Video

ARGE Sanierung Rechte Kremszeile (Austria)
Implementation: 2008
Aeration in terms of odour stabilisation of approx. 35.000 m³ soil contaminated with waste in a former Donau creek at Krems prior to removal and treatment of the contaminated material.

MEAB Schöneiche intermediate landfill (Germany)
Implementation: 2007
Pre-aeration of an intermediate waste depot using the BIOPUSTER process prior to controlled re-usage (100,000 m²).

Research Institute for Global Environmental Systems Ltd., Osaka (Japan)
Implementation: 2006-2007
Demonstration project: Treatment of organic waste in combination with ash from incinerated household waste using the BIOPUSTER process.

Bilfinger Berger Ambiente, Fiorenzuola (Italy)
Implementation: 2005-2006
In-situ stabilisation of an 80,000 m² landfill using the BIOPUSTER process in the municipality of Fiorenzuola.

ARGE Clearance of Fischer landfill, Theresienfeld (Austria)
Implementation: 2004
Containment and removal of organic contaminants (CFCs, BTEX) from around 30,000 m² of mineral waste; extracted over two planes.

Research Institute for Global Environmental Systems Ltd., Miura-Shi (Japan)
Implementation: 2004
Demonstration project: Overhaul of a Japanese landfill using the BIOPUSTER process in the Kanagawa-ken District.

Burgenland Waste Disposal Association site, Unterfrauenhaid (Austria)
Implementation: 2003
Overhaul / replacement of seep water drainage at a landfill while still in use by pre-treating the material to be excavated using the BIOPUSTER process.

Wiener Neudorf Council (Austria)
Implementation: 2002-2003
Odour stabilisation of Wiener Neudorf landfill (approx. 750,000 t) using the BIOPUSTER process prior to removing waste material.

Republic of Austria, Theresienfeld (Austria)
Implementation: 2002-2003
Odour stabilisation of Fischer landfill (approx. 850,000 t) using the BIOPUSTER process prior to removing waste material.

Seibersdorf Research Centre (Austria)
Implementation: 2002
Research project: Treatment of soil contaminated with PAH using BIOPUSTER process to inject ozone. Lysimeter tests.

City of Vienna Council, MA 48 (Austria)
Implementation: 2001
Pilot project: Using the BIOPUSTER process prior to sorting residual waste material at Rautenweg dump with the objective of reducing volume.

ALSAD Langes Feld GmbH, Vienna (Austria)
Implementation: 1999-2000
Large-scale test: Treatment of residual waste fraction using the BIOPUSTER process as a preliminary stage prior to refinement.

Seibersdorf Research Centre (Austria)
Implementation: 1999-2000
Pilot project: Using BIOPUSTER process to overhaul landfill.

ASA Oberösterreich Holding GmbH, Aichkirchen (Austria)
Implementation: 1999-2000
Overhaul of Kiener landfill. Pre-treatment using the BIOPUSTER process to stabilise odour (40,000 m² household and hazardous waste) prior to relocation.

ECOFOR, Pontedera / Pisa (Italy)
Implementation: 1999
Odour stabilisation of approx. 9,000 m² of waste material using the BIOPUSTER process prior to relocation.

Merckens, Schwertberg (Germany)
Implementation: 1999
Pre-treatment using the BIOPUSTER process to stabilise odour (20,000 m²) prior to relocation.

Feldbach Council (Austria)
Implementation: 1998-1999
Biological in-situ overhaul of a 15,000 m² household waste site, partially covered by new buildings, using the BIOPUSTER process (duration of project: 16 months).

Saehan (Korea)
Implementation: 1998
Sold a BIOPUSTER test system (laboratory lysimeter system) and training for personnel.

Bilfinger+Berger Bau-AG (Munich), Nördlingen (Germany)
Implementation: 1997-1998
Complete overhaul of the household waste dump in Nördlingen following treatment using the BIOPUSTER process: replacement of damaged seep water pipes, line-by-line, relocation of 150,000 m² of material after treatment, covering and re-cultivating disused landfill site.

Landkreis Stendal (Germany)
Implementation: 1997
Large-scale test of mechanical-biological waste treatment using the BIOPUSTER process with four different residual waste fractions at Stendal landfill, duration of project: 8 months.

Bilfinger+Berger Bau-AG (Munich), Farchant (Germany)
Implementation: 1997
Pre-treatment using the BIOPUSTER process to stabilise odour (20,000 m²) prior to relocation during the construction of a new bypass road around Garmisch-Partenkirchen.

Republic of Austria, Weikersdorf (Austria)
Implementation: 1996-1998
Odour stabilisation of Helene Berger landfill (900,000 t) using the BIOPUSTER process prior to removing waste material.

Oliebranchens Miljopulje (Denmark)
Implementation: 1995-1998
In-situ overhaul of a former petrol station site using the BIOPUSTER process.

Lower Austria Environmental Protection Agency, Horn (Austria)
Implementation: 1994-1996
Overhaul of the Horn landfill (300,000 m²) using the BIOPUSTER process prior to relocating waste material.

Lower Austria Environmental Protection Agency, Gmünd (Austria)
Implementation: 1994-1996
Overhaul of the Gmünd landfill (150,000 m²) using the BIOPUSTER process prior to relocating waste material.

Austrian Railways, St. Anton (Austria)
Implementation: 1994
BIOPUSTER treatment of the St. Anton landfill during the expansion of the Arlberg railway to two-track.

Compost plant, City of Bad Kreuznach (Germany)
Implementation: 1994
BIOPUSTER treatment to accelerate the decomposition process at the City of Bad-Kreuznach compost plant.

Abfallzweck-Verband, Freiburg (Germany)
Implementation: 1994
Application of BIOPUSTER process to treat household and residual waste material

Bilfinger+Berger Bau-AG, Dresden (Germany)
Implementation: 1993-1994
Micro-biological in-situ overhaul of a former petrol station site using the BIOPUSTER process.

City of Vienna Council, MA 48 (Austria)
Implementation: 1993
BIOPUSTER treatment to accelerate the decomposition process at the Vienna Council compost plant.

City of Vienna Council, MA 45 (Austria)
Implementation: 1990-1991
Overhaul of the EXPO trade fair ground in Vienna: clearing and relocating a landfill with 600,000 m² of household waste and building rubble, first time BIOPUSTER process is used for odour stabilisation.